Parshall Flume - complete MVCP

Parshall chute - Complete MVCP

MVCP - Complete Parshall chute

Complete model with MVCP input and output boxes
Budget
The MVCP MODEL is composed of: Inlet channel Standard Parshall channel Exit box The parshall channel with channel / input box and outlet box is indicated, as the effluent cannot be discharged directly into the channel, according to the standard, so that if the meter is effective, the effluent must be discharged into the box or inlet channel, so that there is only the flow of the flow in the parshall meter, thus reducing turbulence and speed to guarantee the correct measurement. Check out some advantages of the complete model: Practicality and agility in the installation of the complete set, much faster than the conventionalAdvantageous cost-effective relationship, compared to the built masonry channelVisually more beautiful, nontoxic, and easy to maintainOptional cover - important if the equipment stays at open air without coverSizesMVCP W1 "- maximum flow up to 15 m3 / hMVCP W2" - maximum flow up to 30 m3 / hMVCP W3 "low type - maximum flow up to 60 m3 / hMVCP W3" high type - maximum flow up to 193 m3 / h * Above under designContact us for more information
Share by: